1.把重慶升降平臺(tái)液壓油放掉,擰緊接頭取出油過(guò)濾器,洗清后,用壓縮空氣清理干凈,然后放回油箱,換上新油,并連接好管路。Chongqing lifting platform hydraulic oil drain screw joints, remove oil filter, wash, use compressed air to clean up, and then back into the fuel tank, a new oil pipeline connection, and.
2.檢查重慶升降平臺(tái)所有的液壓管道和接頭。管道不能有破損,接頭不能有松動(dòng),必須將所有接頭擰緊。Check all hydraulic pipes and fittings of Chongqing lifting platform. Pipes can not be damaged, joints can not be loose, you must tighten all joints.
3.卸下并拆開(kāi)高起升重慶升降平臺(tái)下面的下降閥,用壓縮空氣將柱塞吹凈,然后裝入,重新安上。Drop valve open high from the Chongqing lifting platform following unloading and, with the plunger blowing compressed air, then load, re install.
全國(guó)服務(wù)熱線
187-2321-1948聯(lián)系電話(huà)
微信掃一掃